
Latest article
How a 6-MWe loss in a CCGT was traced back to start-up
After a hot start, a CCGT lost up to 6 MWe. Metroscope combined physics-based diagnostics with transient monitoring to link the loss to abnormal steam-turbine drain-valve behavior and guide corrective action.
